Assembly, integration, test, and verification scenarios for the ELT MOSAIC instrument - ONERA - Office national d'études et de recherches aérospatiales Accéder directement au contenu
Communication Dans Un Congrès Année : 2018

Assembly, integration, test, and verification scenarios for the ELT MOSAIC instrument

Résumé

Assembly, Integration, Test and Validation (AIT/V) phases for AO instruments, in laboratory as in the telescope, represent numerous technical challenges. The Laboratoire d’Astrophysique de Marseille (LAM) is in charge of the AIT/V preparation and planning for the MOSAIC (ELT-MOS) instrument, from identification of needs, challenges, risks, to defining the optimal AIT strategy for this highly modular and serialized instrument. In this paper, we present the status of this study and describe several AIT/V scenarios as well as a planning for AIT phases in Europe and in Chile. We also show our capabilities, experience and expertise to lead the instrument MOSAIC AIT/V activities.
Fichier non déposé

Dates et versions

hal-02361131 , version 1 (13-11-2019)

Identifiants

Citer

Kacem El Hadi, Kjetil Dohlen, David Le Mignant, Fabrice Madec, Pascal Vola, et al.. Assembly, integration, test, and verification scenarios for the ELT MOSAIC instrument. Ground-based and Airborne Instrumentation for Astronomy VII, Jun 2018, Austin, United States. pp.332, ⟨10.1117/12.2312134⟩. ⟨hal-02361131⟩
70 Consultations
0 Téléchargements

Altmetric

Partager

Gmail Facebook X LinkedIn More